WE3

IT RELOCATION SERVICE

IT-relocation-Copy

– CTC Relocation Solution –

Picture9

1.Relocation Plan

– Project Preparation Plan

– Survey Plan

– Site Preparation Plan

– Backup/Recovery Plan

– Relocation POC Plan

– Hardware Temporary/Spare Plan

Picture1
Picture10

2.Site Preparation

– Site demolish

– Shop Drawing

– Cooling System (Precision Air)

– Power System (UPS, Generator)

– Access Control System

– Monitoring System

– Water Leak System

– FM 200 System

Picture11

3.Backup/Recovery Testing

– Technical Support

– Hardware for Recovery Testing

– Backup Recovery Document

 

Picture3
Picture12

4.Relocation POC

– Relocation Process Approve

– Timing

– Hardware Temporary/Spare Testing

Picture13

5.Transportation

– Site demolish

– Shop Drawing

– Cooling System (Precision Air)

– Power System (UPS, Generator)

– Access Control System

– Monitoring System

– Water Leak System

– FM 200 System

Picture4
Picture14

6.Warranty & Insurance

– Insurance

– 1 Month Hardware Warranty

– Standby (Engineer)

Picture5

OUR IT RELOCATION SERVICE INCLUDES

1213
Move02
Move03
Move04
Move05
Move06
Move07